Testing & Commissioning (T&C) is the process of testing and calibrating the final electromechanical system to ensure that the system is operating according to specifications and stable before handing over. T&C work at the project is expected to last from 2-3 months with the main systems: Electricity & Light, HVAC, Water Supply and Sewerage and Fire Protection.
Mechanical system:
- Testing and balancing for wind and water systems of air-conditioning and ventilation.
- Check design, construction drawings to make sure the system can be calibrated.
- Pressure test for all types of containers.
- Pressure test for piping system (HVAC, fuel, fire, water supply, wastewater, rainwater ..)
- Test features and controls for devices.
Power system:
- Circuit test.
- Insulation test.
- Test the features for electrical cabinets, controllers, data, phones, other devices.
- Safety test.
- Measure the operating parameters of the lamp, signal, volts, and power.
From Hoang Sa’s works, customers can rest assured that the System will operate stably and safely Testing and Commissioning GMP standards provided by Hoang Sa. With many years of experience, Hoang Sa’s T&C team is always present to operate, test run before putting into operation, ensuring the system to operate normally according to design and construction methods.
System understanding, extensive experience with large and diverse projects allow us to act quickly, respond sensitively to all situations, perform well in the operation and maintenance stages, bring satisfaction to customers. trust for customers